Brighton and Hove road closures: seven for motorists to avoid over the next fortnight

Road Closed signs. Tuesday May 12th 2020Road Closed signs. Tuesday May 12th 2020
Road Closed signs. Tuesday May 12th 2020
Brighton and Hove's motorists will have seven road closures to avoid nearby on the National Highways network this week.

Brighton and Hove's motorists will have seven road closures to avoid nearby on the National Highways network this week.

And one of them is expected to cause delays of between 10 minutes and half an hour.

Hide Ad
Hide Ad

The latest expected works list, with notes from National Highways, shows that two closures already in place are expected to carry on this week:

A27, from 8pm January 28 to 6am January 29, slight delays (under 10 minutes): A27 westbound, Ashcombe to Hollingbury, Lane closure for maintenance works.

A27, from 8pm January 14 to 6am February 12, moderate delays (10-30 minutes): A27 both directions Patcham Interchange to Falmer Interchange, carriageway closure for structures inspection.

And a further five closures will begin over the next two weeks:

Hide Ad
Hide Ad

A27, from 8pm January 31 to 6am February 1, slight delays (under 10 minutes): A27 eastbound, Lewes Road, slip road closure for structures inspection.

A27, from 8pm January 31 to 6am February 1, slight delays (under 10 minutes): A27 both directions Falmer to Carden Avenue, slip road and lane closures for maintenance works.

A27, from 8pm February 1 to 6am February 3, slight delays (under 10 minutes): A27 both directions Ashcombe Rdt to Falmer junction, slip road and lane closure for surface works.

A23, from 8pm February 1 to 6am February 3, slight delays (under 10 minutes): A23 and A27 both directions Patcham to Pyecombe, slip road and lane closures for structures inspection.

Hide Ad
Hide Ad

A27, from 8pm February 5 to 6am February 10, slight delays (under 10 minutes): A27 both directions Falmer, diversion and lane closure for bridge works.

National Highways is responsible for maintaining motorways and major A-roads, so closures of smaller roads will not be included in their schedule.